07 S/C Phazer with SLEDSTART

yam429

Expert
Joined
Jan 18, 2009
Messages
285
Reaction score
34
Points
928
Location
Saint Michael, MN
Country
USA
Snowmobile
2009 Nytro XTX, 2010 Vector LTX, 1981 SRX 440, 1989 Inviter, 1991 Snosport, 2004 Snowhawk
LOCATION
Saint Michael
Installed a SLEDSTART on an 07 supercharged Phazer. The problem I’m having is when the sled is started with remote it only runs for 10 seconds & then shuts down. Could the Gem controllers be messing this up? Any ideas on how I can fix this problem?
 
GEMS controller messes it up because that is the "cycle time" of the GEMS when it first starts.
 
So how do I get around this? I know one of the TY members said he hard wired in the injector wire coming off the SLEDSTART but where? After the Gem controllers or before the controllers?
 
You'd have to take signal before the controller, that's why it quits, the controller screws up the signal. Sorry, I don't know exactly how to do it.
 
Ok thank you Allen. I’ll take any help I can get.
 
Fixed. Didn’t have to cut into any wires. Just plugged into the wiring harness that goes to the injector on the PTO side of the sled. It was almost to easy.
 


Back
Top