I did mine to my old sled before this season. Took me 2 hours tops...
Side panel and lower side panel, oil tank, side cover w/ approx. 14 4mm allen head bolts 5 bolts inside cover, reroute wires, reassemble.
Pretty easy to do if you ask me. I think it took me 2 hours w/ replacing the oil filter as well.