I think I just used 1/4" by 1" aluminium flat bar and bolted it to the existing bracket. It fits right in the groove and you just need a washer on the end of the cross shaft to take up the extra length. I think lowered the shaft about 3/4". I don't have this installed yet. I had it all mocked up but didn't have time to get the tunnel extension powdercoated and installed so I put it all back to stock in December. Hopefully I will get this all completed over the summer and I will post some pics.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.