You could always do a search but that would take forever.
Besides I like to type. This way I can hear myself talk to myself.
If you line the plate up on the bottom of your sled you will see the 4 rivits you will need to drill out. Mark them with a sharpie if your memorie is short like mine.
Drill the rivits out first then step the bit size up to your final size. You need a 10mm drill bit for the final whole. ORRRRRR, most people can not find 10mm drill bits so find a 25/64th drill bit. Most hardware stores should have them. Lowes stocks them.
The instructions say do not drill deeper than 20mm so use a drill stop. The socket trick will work also.
Also remove the 2 screws that are in the front of the sled under the bumper.
You will need 4 6mm rivnuts. and the tool to set them. The Yamaha install kit comes with all the hardware you need. I think they sell for $29 if you do not have one. Or did not come with the plate.
Here is a good site for Rivnuts if you need them:
http://www.mcmaster.com/param/html/rive ... efault.htm
You are looking for the open ended Knurled rivnut OR as McMaster calls them Rivit Nuts
McMaster Carr # 94020a383 Solld in packs of 25 for $12.74
The Tool I got from the tool truck:
http://www.matcotools.com/Catalog/toolc ... e=1綑
Granted Napa sells the same tool for less but I like it when my tools come to ME
So if you are not going to be putting rivnuts in lots of places the Yamaha kit is the way to go
The kit is available from Port Yamaha:
Replacement Mount Kit - fits all RX and RS
SMA-8FA34-MT-KT
They have kits for all the other models.
http://www.portyamaha.com/eshopitems_ca ... _Flaps.htm
Hope this helps
Frogg