New Year, New sled build.

LSXM3

Expert
Joined
Mar 24, 2011
Messages
407
Reaction score
0
Points
131
Location
Corcoran, MN
So i am starting my build now, as some of you know i have an 08 Fx nytro with a Zbroz front end and an OFT 136" kit.....which has done me fine for this year but time to change things up a bit.

So over the summer I will be doing the following:
-FabCraft 144" RBC tunnel
-Nextech Carbon Mono 144" skid
-Fox Float front shocks
-New updated sub frame With Grizz tracks update
-New Exhaust set up using low profile oval tubing (like NASCAR uses)

So basically a new sled for next year.....so if anyone is interested in any of the old parts ie, front gytr clickers, stock tunnel, oft 136" rail extensions w/8" wheel kit, stock 121" rear skid just pm as i will be becoming a vip member and posting this stuff in the classifieds soon.

:rocks:

-Dave
 
PROBABLY, The only thing im keeping is the front a arms and the bulk head, everything in front and behind is being replaced....lol
 
LSXM3 said:
-New Exhaust set up using low profile oval tubing (like NASCAR uses)

Dave:

I have been struggling to find flat oval tubing for a couple of years now. Wanted to use it to send my under tunnel exhaust right out the back of the tunnel, but only have about 1 inche of thickness to play with (but lot's of width).

Always seemed to dead end, and thought the Nascar stuff whas just exhaust tips only. Any help appreciated.

OTM
 
OTM I have found a company that will make it for me out of stainless in any size i want, just takes time and $ to make. Ill try in the next week to get you the info
 
LSXM3 said:
OTM I have found a company that will make it for me out of stainless in any size i want, just takes time and $ to make. Ill try in the next week to get you the info

Thanks LSXM3

Please keep me informed. I tested an XTX with an unertunnel and rear exhaust dump above the snow flap. It worked well at keeping the rear of tunnel clear of ice, and what build up you had could simply be kicket away. The only problem we had was cracking at the welds of the oval tube, but the whole thing was a work in process anyway and wasn't the best TIG job either...still learning at that point.

OTM
 
Just an update, I officially placed the order for the Fabcraft 144" RBC tunnel today with SS 6X9 drop brackets and a wrinkle black finish, Should be here in a month or 2 (late may/early june time frame)

Its starting to feel like this project is finally getting started.
 


Back
Top