vector40th said:2"dia. steel pipe about 6" long, cut down the middle. taper the ends. drill 2 holes so you can install in between the carbides and the ski. i found this info on here about a year ago, tried it and it worked great. i hated the handling of my vector before this. now it handles great. there were pics of what im talling about on this site when i learned about it.
vector40th said:right in the middle.