yami ryder
Pro
i have switched out headers several times, drill the 10 rivets out. do not tighten anything until rear center plastics are on. before you put on heat shield you can set fuel tank next to sled and hook up lines start sled to make sure no leaks at donuts.
yami ryder
Pro
i have switched out headers several times, drill the 10 rivets out. do not tighten anything until rear center plastics are on. before you put on heat shield you can set fuel tank next to sled and hook up lines start sled to make sure no leaks at donuts.
Nitrousman1
Expert
Agman 57 said:Why do you think they put it on facing forward instead of to the rear? I guess that would make it to easy to work on later. LOL
So you have to take it to the dealer to get it fixed. I guess with the mount facing forward if the bolts came loose the pipe couldn't slide out backwards but I think it's a pretty stupid design.
Nitrousman1
Expert
yami ryder said:i have switched out headers several times, drill the 10 rivets out. do not tighten anything until rear center plastics are on. before you put on heat shield you can set fuel tank next to sled and hook up lines start sled to make sure no leaks at donuts.
I've already got the pipe in place but I'll maybe try running it with the tank next to the sled before I finish it and check for leaks. Thanks.
Similar threads
- Replies
- 8
- Views
- 3K
- Replies
- 4
- Views
- 1K