I very new to this so bear with me. I wanted to adjust the spring tension down and try a couple of runs with it but after pulling the nuts off I didn't find any numbers on the secondary (just the outer cover 0,3,6,9). Put it back together leaving the spring in the same position on the secondary and moved the helix cover to 3. I wanted to try a 3-3 (60%) set-up. I didn't get to run it other then on the stand to make sure I had everything back together right and it seemed fine. I have an Ulmer Stage 2 on the way but wanted to try this before it arrived. It was stock before this adjustment. Does this sound correct?