

swelly
Lifetime Member
- Joined
- Feb 2, 2009
- Messages
- 497
- Reaction score
- 0
- Points
- 821
- Location
- Anchorage/Seward, AK
- Website
- www.swelltimecharters.com
Not a major undertaking, but sure seemed to take forever. Some changes and mods for the current riding season. I was hoping this would have only taken a few weeks working in the evenings, but ended up being about a month. Way to much stuff happening away from work.
Here is what I did.
Under Tunnel Exhaust-Used a Kawasaki ZX10 Muffler
Anti stab Kit
Challenger Extreme 153
Better Boarts
Vent Kit
OFT Tunnel Block Off Plate, "this thing is sweet"
For me the Track swap was the easiest, other than the block off plate. It took 4-5 minutes for that. Making the exhaust was the most time consuming. Trips to the parts store for adapters and couplers took a lot of time.
I have vowed to own a small lathe in the near future. For me it would have made some of the job easier.
Here is what I did.
Under Tunnel Exhaust-Used a Kawasaki ZX10 Muffler
Anti stab Kit
Challenger Extreme 153
Better Boarts
Vent Kit
OFT Tunnel Block Off Plate, "this thing is sweet"
For me the Track swap was the easiest, other than the block off plate. It took 4-5 minutes for that. Making the exhaust was the most time consuming. Trips to the parts store for adapters and couplers took a lot of time.
I have vowed to own a small lathe in the near future. For me it would have made some of the job easier.