• We are no longer supporting TapaTalk as a mobile app for our sites. The TapaTalk App has many issues with speed on our server as well as security holes that leave us vulnerable to attacks and spammers.

Project Vector...

Srxspec

Ulmer Racing
Tech Advisor
Joined
Apr 17, 2003
Messages
5,348
Location
Menno, SD
Website
www.ulmerracing.com
Country
USA
Snowmobile
2014 Yamaha SR Viper LTX, 2014 Yamaha SR Viper RTX SE, 2015 Yamaha SR Viper MTX SE 162 (turbo), 2015 Yamaha SR Viper MTX SE 153
LOCATION
Menno, SD
WEBSITE
www.ulmerracing.com
Just started on the 2007 Vector Mtn SE project. Have a pile of parts here to put on it and a few more parts yet still to come!

Pile of parts consists of:
-MPI Supercharger
-Lightweight hood
-Timber Sled Barkbuster Front End
-Lightweight seat
-Slydog Powderhound skis
-Fox Float front shocks
-Excell Motorsports high flow header
-Excell Motorsports Mountain Lite exhaust
-Timber Sled drop brackets

More pictures to come as the progress continues!!

Vector005.jpg


Vector006.jpg


Lexan Hood:
Vector004.jpg


Vector003.jpg


High Flow Header:
Vector002.jpg


Supercharger:
Vector001.jpg
 

sledskiing, I'm not actually sure if it's a mountain fit hood or a snostuff hood. I picked it up from Pro116 off of here. Send a PM to him and he may be able to tell you which one it is!
 
Few more pictures...

The tear down begins!!
Vector007.jpg


Vector008.jpg


Removed gas tank for high flow header install.
Vector009.jpg


Removing parts for the supercharger install.
Vector010.jpg


Skid removed (installing different track).
Vector011.jpg


Vector012.jpg


Track removed.
Vector013.jpg


Stock header installed.
Vector014.jpg


Muffler protector plate.
Vector015.jpg


Stock header vs High Flow Header.
Vector016.jpg


Vector017.jpg


High flow header installed.
Vector018.jpg
 
Just started the install on the supercharger components.

PTO drive install.
Vector019.jpg


Vector020.jpg
 
Rest of today's progress. Time to go home for tonight and start on it tomorrow morning! I'm in the process of drilling the pilot hole for the supercharger stub shaft to go through the Delta Box when I realized I didn't have the 3/4" hole saw that I needed. :o|

View from the front.
Vector021.jpg


Fuel System Electronics.
Vector022.jpg


Fuel Return block.
Vector023.jpg


Another view from the front.
Vector024.jpg


Fuel system installed.
Vector025.jpg


Supercharger drive bracket.
Vector026.jpg


:4STroke:
 
Let us know what you think of the Barkbuster front end (especially the spindles) when you get it installed. Saw it at the Puyallup show and was quite impressed.
 
Some of today's progress.

Pilot hole drilled.
Vector027.jpg


Supercharger installed!
Vector028.jpg


Vector029.jpg
 
Today's progress. More work to be done tomorrow.

Just a picture of the hole required to be drilled through the Delta Box.
Vector031.jpg


Picture of the special tool you need to tighten the supercharger shaft nut to torque it to 40 ft lbs.
Vector038.jpg


Vector039.jpg


Supercharger top bracket (I had to loosen the top oil line and rotate the line slightly so the bracket fit correctly.
Vector030.jpg


Front View.
Vector032.jpg


CDI position.
Vector033.jpg


Modification of the battery bracket. It didn't quite fit how I liked so I modified it slightly for a better fit.
Vector034.jpg


Vector035.jpg


Vector036.jpg


Vector037.jpg


Picture of the front nose cone area.
Vector040.jpg


Vector041.jpg


Battery tray installed.
Vector042.jpg
 
What a great project! I'm jealous. What a clean sled! What is the stuff that get's installed front of the bulkhead? Looks like the fuel pump is up top. I saw a brand new mountian vector the other day with the crappy old tunnel design. What's the difference between yours and it? Did the vector get the new ergos? (rider forward) That is the only thing that sled will be missing that seems to make a big difference. While you got it stripped is the time to do it.
 
Today's progress.

Removing the stock oil can from the air box.
Vector043.jpg


New MPI oil can.
Vector044.jpg


Vector045.jpg


Oil can installed.
Vector046.jpg


Vector047.jpg


Vector048.jpg


Battery, carbs, and air filter installed.
Vector049.jpg


Vector050.jpg


Vector051.jpg


Intercooler installed.
Vector052.jpg


Vector053.jpg


Hood installed.
Vector054.jpg


Vector055.jpg


Vector056.jpg


Airflow to the supercharger oil cooler.
Vector057.jpg


What's next? Reinstall the stock exhaust for the moment as it will be the end of December before the Excell Mountain Lite is ready as well as the Barkbuster front end.
 


Back
Top