• We are no longer supporting TapaTalk as a mobile app for our sites. The TapaTalk App has many issues with speed on our server as well as security holes that leave us vulnerable to attacks and spammers.

Pro Rmk front on Nytro...


SD: You write the ASA let you disassemble some shocks ... Is there an internal spring in those shocks?
 
OVR4D said:
SD: You write the ASA let you disassemble some shocks ... Is there an internal spring in those shocks?
Its a nitrogen "spring", a rubber membrane that separates the gas from the oil.
 
My "Quick pin kit" is done, no tools are needed to remove the hood.



also started to cut the plastic for the Nytro reverse lever.

 
Made a bracket to attach the the plastic to the reverse lever assembly, and did some more cutting around it.


Remove front clip.


Installing the Engine.



And assemble Everything again. and looking at clearance around the clutches.


A bit close.


Did some work with the knife.
 
Time to finnish the tunnel.





The front plates are from a shortie so i add some material to them to reach the MTX mounting holes.





Im trying a DIY Zink plating instead of painting the added material, paint will just chip off and it will start to rust.



I found a cheap Arctic cat ZR 600 EFI fuel pump that i was going to take the hose and pick ups from and as a nice bonus the top aluminum block was a perfect match to the fuel tank opening, nice not to have to fabricate that piece.





What is the capacity of the stock nytro fuelpump ?
The ZR 600 pump has these specs. 80 ltr/hr (21 gal/hr) at 250 kPa (36.25 psi).
I think its to small for my engine what do you think should i go for a bigger external pump ?
 
The result of my first ever zink plating.
I just googled and Youtubed for some info and made my own stuff, there are "DIY kits" that you can buy and you could get a better finish if you use it on parts thats visible, but on this parts im only after the rust protection.



Got some small parts for the gas tank : A gas cap (i had a oil tank cap), the breather hose and a bit of submersible hose.

 
Riveted the front cooler, the metal sheet from cooler to tunnel, front tunnel reinforcements and the tunnel to the chassi. Im not planning in removing them anymore.
Next step will be to fit the PPS skid i want to do that before installing the runningboards.



 
Not much done today but i have started on the PPS skid install.

20131117_184359_zps3d583086.jpg
 
Been messing around with the PPS install and i have a template from a Lynx tunnel but it have the driveshaft lower than the Nytro and a different angle on the tunnel so my first try was a fail, got way to much tension on the track so i had to move the skid forward and make a new hole.
I will make a reinforcement plate on the outside of the tunnel so you wont see the cluster of holes.




Then i made a oversized plate for the dropbracket and drilled the rest of the holes with my template.
next i will cut down the dropbracket and make some reinforcements on the inside of the tunnel since the the Nytro tunnel is wider i need some material to fill up the gap to the skid mounts.



two weeks ago i ordered som real cheap hand warmers on Ebay that im going to try.
9$ with shipping for two sets thats unreal !?!?!








 


Back
Top