2012 AK sled build

rlcofmn said:
Sportsterdanne said:
The tunnel looks really good.

I'm glad someone thinks so.

Sorry buddy, you know we love ya. But someone had to say it. ;):D

Hey I like it. I think it's cool that he left the running boards wide enough to land a super cub on too. Mobile air strip, next level chit.

Also, Caleb, what's this nonsense about your riding buddies opinions? Having riding buddies implies you ride... :D
 
I'll be on it again Saturday. I'm still working out of town 5-6 days a week. I spent last Sunday tearing my sled apart so I could rob the coolers.
 
Picked up my 156x16x2.5, 153 Ice Age rails and Synapse diverter valve today.
IMG_3431.jpg
 
Got the cross bar done for the gas tank/seat frame. Another 21 rivets in that sucker. Sunday I'll get started on the seat frame which will tie the two cross bars together.

IMG_3439.jpg

IMG_3440.jpg

IMG_3441.jpg


Here's a pic with my old seat frame just for a reference. I'm going to try and tuck the battery in their too to get some more weight out of the front.
IMG_3433.jpg
 
Gas tank trimmed for the cross bar
IMG_3448.jpg


IMG_3451.jpg

IMG_3455.jpg

IMG_3457.jpg

IMG_3462.jpg

IMG_3471.jpg

IMG_3476.jpg

IMG_3473.jpg


I'll have a forward support for the seat but it will be bolt on. It's a tight squeeze to get the gas tank out as it is. When I get back next week I'll finish the gas tank mounts, seat mounts, battery bracket, and misc. tunnel items.

My old seat frame was 2 lbs + bolts. Current one is about .75 lbs worth of 1/2" tube.
 
Seat Frame looks Great!!!! :Rockon:

Did I mention I went riding this weekend? ;):D
 
Baby 2554. I have everything needed to build it. Come Friday I get 11 days off so I'm going to try and finish the chassis and build the turbo.
 


Back
Top