UPDATE December 11. - Adding more heat shielding near the turbo and header. Adding engine oil. Installing track, driveshaft and chaincase. Installing brakes.
With the heat from the turbo and header I decided to do the heat shielding right once and for all. I have now shielded all hoses and openings to keep radiant heat from beeing a problem.
I shielded all hoses with a aluminum coated fabric that will not burn, I tried but I could not lit the fabric, guess it will work well.
I added some tape on the steering column bushings as well.
I also shielded the throttle wire.
To prevent radiant heat from the header to reach the engine and engine compartment I made up a cover out of an even thicker type of aluminum covered fabric, I wrapped it double and taped it to the engine and the deltabox cross bar.
Next was adding 2 liters or 2+ quarters of engine oil to the oil tank. Before adding more I have to crank the engine some to have the oil drawn into the engine, then add another 1-1.5 liters/quarters of oil.
My friend Odd Steffen fixed the misaligned extrovert by pushing it in position using a hydraulic press. Thank you buddy
The track and driveshaft in position.
I installed a new bearing, the speedo pickup system, and installed the bearing cup loosely, I did not tighten it to spec at this time.
Chaincase housing installed.
Chaincase internals installed. I went with a 25T upper drive sprocket, can't wait to se what she can do with slightly higher gearing. Adjusted chain tension finger tight.
Chaincase cover installed. Oil added.
Next was tightening the secondary side bearing cup to spec and tightening the two set screws (inside the tunnel) holding the bearing to the driveshaft.
To finish off Thursday nights work I installed the brakes. In order to get the new brake pads away from each other you will have to open the lid on top of the brake reservoir at the handlebar. Put some rags underneat the reservoir, brake fluid is bad for plastic parts and paint.
I know I promised a few pics of my friends project, '06 Attak going from rearmount MCX to frontmount PL. The header, turbo and downpipe.
He have prepared the tunnel for installation of the REV gas tank.